News Feature | November 19, 2026

Los Angeles And Long Beach Port Talks Stall Ahead Of Saturday Strike Deadline

Source: Clinical Supply Leader

By Elizabeth Urbanek, Executive Editor

High Angle Drone Shot of Truck in Container Terminal-GettyImages-2123123943

Contract talks covering security workers at the ports of Los Angeles and Long Beach have stalled, and a strike could begin as early as Saturday, Nov. 21. Sponsors moving clinical trial materials through the nation's busiest container port complex have about two days to decide whether to act.

In a statement issued Nov. 18, the Pacific Maritime Association (PMA), which represents terminal operators and ocean carriers, said its latest session with International Longshore and Warehouse Union (ILWU) Local 26 ended Nov. 17 with little to no movement on its proposals. PMA said the union has held a strike vote and is unwilling to extend the contract past its expiration at 12:01 a.m. Saturday. The two sides are scheduled to meet again Friday, Nov. 20.

This is a follow-up to Clinical Supply Leader's Nov. 10 report, Los Angeles And Long Beach Port Strike Deadline Moves To Nov. 20, Keeping Ocean Freight Risk In Play, which covered the extension that carried the contract through Nov. 20. What has changed is that talks have broken down and the union has signaled it will not agree to another extension.

Local 26 represents about 250 watchmen, roughly 2% of the ILWU workforce at the two ports, who work at six container terminals. Those terminals handle more than half of the ports' combined cargo, including about 85% at Long Beach and 33% at Los Angeles, according to PMA. The association expects thousands of longshore workers, marine clerks, and foremen who are not part of the dispute to honor a Local 26 picket line.

The dispute is separate from the coastwide contract covering West Coast longshore workers, which runs through 2028. The watchmen's previous contract expired in July 2025, and the two sides have bargained under a series of extensions with help from the Federal Mediation and Conciliation Service.

PMA's statement does not say how long a strike could last or how refrigerated containers already at the terminals would be handled during a stoppage. As of Nov. 18, the union had not publicly responded to the statement.

What This Means For Clinical Supply

For clinical supply teams, the exposure is inbound ocean freight entering the U.S. through San Pedro Bay. That can include commercially sourced comparators, ancillary supplies, packaging components, and bulk drug product or API shipped from Asia. If dockworkers honor a picket line, containers at the six terminals could sit until the dispute ends.

Material already on the water is the hardest to protect. Vessels due at Los Angeles or Long Beach this weekend cannot easily be redirected, and rerouting to another West Coast, Gulf, or East Coast port adds transit days along with new customs and trucking arrangements. Shipments still at origin offer more options, including a move to air freight, but at higher cost and with temperature-control and capacity limits of their own.

Refrigerated containers carry added risk. If a stoppage extends dwell time at the terminal, sponsors would need to confirm that reefer power and temperature monitoring continue and that someone is reviewing the data. Any excursion would then need to be assessed against stability data before the material could be released for use.

The tradeoff is cost against continuity. Paying to divert or expedite shipments that might have arrived without trouble is a real expense. But a stoppage lasting several days could draw down U.S. depot inventory and push interactive response technology (IRT) resupply onto safety stock. The right answer depends on how much buffer each study holds at U.S. depots and sites and how quickly enrollment is consuming it.

Making that call requires the freight forwarder, customs broker, depot, and supply planner to work from the same list of exposed shipments. Teams would need to identify every inbound container routed through the two ports, confirm which terminal it will use, flag temperature-controlled loads, and agree in advance which shipments will be escalated if talks fail.

PMA's statement reflects the employers' account of the talks. It does not predict whether a strike will happen, and Friday's session could still produce an agreement or another extension.

For sponsors with material headed to Southern California, the operational question is whether U.S. inventory can absorb a stoppage of several days or whether specific shipments need to move now.

The Supply Question

Should sponsors pay to reroute shipments now, or lean on U.S. safety stock and wait out a strike that may not come?

Related Clinical Supply Leader Editorials:

About The Editor:

Elizabeth Urbanek is the Executive Editor for Clinical Supply Leader, where she works with clinical trial supply and logistics professionals across pharma and biotech to bring real-world perspectives, operational challenges, trends, scientific insights and regulatory strategy to the field.

Before joining life sciences media, Elizabeth spent more than 15 years in broadcast, digital and live-event storytelling, helping highly technical teams communicate complex ideas with clarity and impact. She brings that same approach to clinical supply, creating editorial space for experts to share what is happening across clinical trial operations.

Elizabeth is passionate about connecting people and ideas, identifying emerging themes and showcasing work that can move the clinical supply field forward.